[Prev][Next][Index][Thread]

(meteorobs) NEAR Update - April 14, 2000




------- Forwarded Message

------------------------------

From: Ron Baalke <BAALKE@KELVIN.JPL.NASAdot gov>
Date: Fri, 14 Apr 2000 17:09:03 GMT
Subject: [ASTRO] NEAR Update - April 14, 2000

NEAR Mission Status Reports - http://near.jhuapldot edu
April 14, 2000

MISSION OPERATIONS:

NEAR Shoemaker continued to operate nominally this past week in orbit
around the asteroid 433 Eros.  NEAR Shoemaker remained in Operational Mode
with Flight Computer #1 and Attitude Interface Unit #2 in control of
spacecraft attitude.  The spacecraft instrument suite remained "ON" and
operational this week.

NEAR Shoemaker is presently in a nominal 100 km circular orbit around
Eros. The spacecraft began the week in a 200 km x 100 km transfer orbit
that was circularized at 100 km during Orbit Correction Maneuver 4 (OCM
4).  This maneuver was performed on April 11, 2000 at 21:20 UTC.  NEAR
Shoemaker will remain in the 100 km circular orbit conducting Science
observations until April 22, 2000 at 17:30 UTC when Orbit Correction
Maneuver 5 (OCM 5) will initiate a 100 km x 50 km transfer orbit.  As OCM
5 is refined, this burn time could move as much as +/- 1 hour.

Preparations and testing of OCM 5, which will place NEAR Shoemaker in a
100 km x 50 km transfer orbit, will begin next week.  Similar to previous
propulsive events, final burn parameters and a timing update will be
loaded to the spacecraft when they become available late next week. 

Problems with the Multispectral Imager (MSI) Data Processing Unit (DPU)
flight application software have been corrected by the software patch that
was successfully loaded March 30, 2000.  During this past week, the MSI
has performed flawlessly.

Science activities conducted this week included Eros observations by the
full instrument suite: MSI, NIS, MAG, NLR and XGRS.  Please consult
science timelines for more details.

Upcoming Spacecraft Activities:

In addition to regular Eros Science and Optical Navigation, the following
are operationally significant activities planned for the NEAR Shoemaker
mission operation: 

April 22	Eros Orbit Correction Maneuver 5 
		(100 km  x  50 km transfer orbit)

April 30	Eros Orbit Correction Maneuver 6 
		(50 km orbit circularization)

------------------------------

------- End of Forwarded Message


To UNSUBSCRIBE from the 'meteorobs' email list, use the Web form at:
http://www.tiacdot net/users/lewkaren/meteorobs/subscribe.html